MONITORING YEAR 2022
PUBLIC SUMMARY MONITORING
Aspect |
Monitoring
Elements |
Monitoring
Result |
ECOLOGICAL |
Fauna |
|
Composition
and changes in fauna |
Wildlife
monitoring o
Baseline
information was also collected on Ecological status of Mammal and Avifauna Species
and recommendation for its management. o
A
total of 40 of different mammal species with eleven species new record
species in 2022, while for avifauna species, a total of ten (10) species new
record with total of 27 species was recorded in 2022. |
|
Flora |
||
Growth
rates, regeneration of the forest and condition of the forest |
Permanent
Sample Plots (PSP) o
Ten
(10) PSPs have been established in February and March 2019 o
Re-assessment
of PSP will be conduct in three (3) (min) or five (5) (max) year. o
No
info on growth rates, regeneration till re-assessment |
|
Composition
and changes in Flora |
o
RIL
Pre-inventory for Coupe 2 started in end of 2020 and still on going for coupe
3. Thus, Pre-inventory data was available only for 35 blocks in coupe 2 o
Family
Dipterocarpaceae was the most abundant and dominated within all the PSPs with
1374 individuals recorded or about 30.61% of the total number and followed by
Euphorbiaceae and Myristicaceae with 746 (16.62%) and 201 (4.48%) trees
correspondingly. Other tree families recorded with more than 100 individuals
were Burseraceae, Fagaceae, Lauraceae, Malvaceae, Myrtaceae and Rubiaceae. |
|
ENVIRONMENT |
Harvesting
impacts |
o There
is no still no harvesting impact has been evaluated since harvesting
operation just started in year 2022. |
Environmental
monitoring impact and compliances |
o Environmental
monitoring impacts was conducted quarterly by consultant through
Environmental Monitoring Report (EMR) o Based
on the EMR for quarter 1 until 4 for year 2022, the water qualities were
generally found to be good, with the most parameter monitored within Class I
to IIB of the NWQSM. pH and DO levels were moderately high (reading were
fairly common for river water in Sarawak). The BOD, COD and ammoniacal
nitrogen levels as well as the coliform count were all detected at the low
sides. The TSS level was low and within the Class II limit of 50 mg/1. No oil
and grease were detected in the waterway, showing that the machinery used
were well maintained (i.e., no leakage), and the spent oil and grease had not
been thrown indiscriminately into the watercourse.
|
|
ECONOMIC |
Yield of
all forest product |
o Production
for FMU started from October 2022 and still progressively on going. |
Productivity
of forest management |
o Production
record of harvested area started on October 2022 and still on going for coupe
02BR. |
|
Efficiency
of forest management |
o Evaluation
between pre-felling inventory 100% enumeration and production of harvested
area will be conducted end of the year since harvesting just started on
October 2022 |
|
Budget |
o Actual
expenditure for year 2022 and budget for year 2023 have been prepared |
|
SOCIAL |
Local communities |
|
Social
impact |
o Potentially
the FMU has a certain positive impact on the affected communities since FMU
on going to maintain the Forest management certification where the FMU need
to comply with all the principal. o Operation
has been started at Coupe 2BR (Total 37 blocks). Thus, seven (7) blocks
already have agreement and consent from 13 owner (local community
within FMU) and FMU also already harvested and made compensation
based on the agreement. o The
local community that stays at long house were still engaged in forest related
occupation such as Hunting, fishing and collect forest produce and sell it at
longhouses, adjacent school, and Kapit. Other than that, they also engaged in
farming as a mean of live- hood. They usually planted vegetable and fruit
tree in small scale for own consumption and sale. o Consultation
and awareness program has been conducted to the local community for year
2023. |
|
Forest
Protection |
o
Patrolling
has been done to prevent encroachment to this area o
No
encroachment has been recorded in year 2022 |
|
Workers |
||
Safety
and Health Committee |
o No
accidents occurred until end of December 2022 o Site
inspections in for site have been done in 2022
|
Updated
on June 2023
Comments